Performance Radar Chart Prompt
A metrics animation for product benchmarks and team performance reviews: the METRIC MATRIX title opens into a hexagonal radar chart, then becomes a line graph ending on OPTIMAL. Swap the metrics, percentages and final word.
Data & infographics · 16:9 · 10s · dark & neon, line draw-on, shape morph, data story
The prompt
Prompt · 227 words
Make a 10-second 16:9 data animation showcasing a technical performance assessment transitioning from a kinetic title to a radar matrix and growth curve. Look: Dark slate background #0B111E with a faint 1px technical grid #1E293B. Data visualization elements in electric cyan #00E5FF, vivid violet #8B5CF6, and stark white #FFFFFF, accented by signal orange #FF6B00. Typography uses Montserrat Bold for titles and Space Mono for telemetry readouts. Data: Metrics labeled SPEED, QUALITY, SCALE, with summary readouts 92%, 78%, and 64%. Beats: 0–2.5s: Centered title METRIC MATRIX in 160px white splits apart vertically from a center divider mask, flanked by two orange accent slashes, then shrinks rapidly into a glowing center point. 2.5–6.5s: The point expands into an 800px wide hexagonal radar grid with six concentric guide rings. Two translucent data polygons in cyan and violet inflate outward from the origin to target vertices. Six 64px axis tags and three prominent 96px percentage callouts (92%, 78%, 64%) pop into view. 6.5–10s: The hexagon vertices collapse inward and pull out into a 1400px wide coordinate grid. Two glowing data lines in cyan and violet trace left to right via path trimming, settling with an orange marker line on a final 160px readout: OPTIMAL. Rules: Construct parent wireframes and coordinate axes before drawing metric fills; use steep exponential ease-out instead of bouncy overshoot; keep stroke widths locked to crisp integer pixels.
Both films above came from this exact prompt, run once on each model. Try this prompt opens the iArt composer on DeepSeek V4.1 Flash, the lower-cost model; you can switch the model there and edit the words, colours and timings before you run it.



